1 Set Of 50 Ton Winch Was Sent To The Philippines
Mar 26, 2023
1 Set Of 50 Ton Winch Was Sent To The Philippines
Winches, also known as winch, is a light and small lifting device that uses a reel to wind a wire rope or chain to lift or pull heavy objects. The hoist can lift heavy objects vertically, horizontally or obliquely. Mainly electric hoist, it can be used alone or as a component in machinery such as lifting, road construction and mine hoisting. It is widely used because of its simple operation, large amount of winding rope and convenient displacement. It is mainly used for material lifting or flat dragging in construction, water conservancy projects, forestry, mines, docks, etc.

1. The winch should be installed in a flat and firm place with good visibility. The connection between the fuselage and ground anchor must be firm. The center line of the winch barrel and the guide pulley should be perpendicular to each other. The distance between the winch and the derrick pulley should generally not be less than 15m.
2. Check the wire rope, clutch, brake, insurance wheel, body pulley, etc. before operation to confirm that it is safe and reliable before operating. Check whether there is friction between the wire rope and the derrick.
3. The wire ropes must be arranged neatly on the drum, and the drum wire ropes must be kept for at least three turns during operation, and no one is allowed to cross the wire ropes of the winch during operation.
4. When hoisting heavy objects and needing to stay in the air, in addition to using the brake, the gear insurance should also be used to lock the car firmly.
5. Operators must hold a certificate to work. It is strictly forbidden to operate without a certificate, and it is strictly forbidden to leave the job without authorization during working hours.
6. Listen to the signal of the commander during work. When the signal is unclear or may cause an accident, the operation should be suspended, and the operation can only be continued after the situation is clarified.
7. If there is a sudden power failure during the operation, the switch knife should be opened immediately and the transported objects should be put down.
8. After the operation is completed, the material tray should be dropped to the ground and the electric box should be closed.